StormWater
Live stream not working in Chrome or Edge?
Troubleshooting steps
In your browser: open Menu (three dots) → Settings → System → turn off “Use graphics acceleration when available.” Then restart the browser.
Transcript
| It's 4:30. | 00:00:00 | |
| Let's get started with a Pledge of Allegiance. | 00:00:01 | |
| I pledge allegiance to the flag. | 00:00:05 | |
| Of the United States of America. | 00:00:07 | |
| To the Republic which stands. | 00:00:09 | |
| One nation under God, indivisible liberty, justice for all. | 00:00:11 | |
| Looking for an approval for November Minutes. | 00:00:22 | |
| Motion to approve. | 00:00:25 | |
| And I'll second. | 00:00:27 | |
| All in favor. | 00:00:28 | |
| Aye. | 00:00:30 | |
| Daily Maintenance reports Chris. | 00:00:33 | |
| Unfortunately this month. | 00:00:37 | |
| With it only being the second. | 00:00:39 | |
| We do not have a copy of the. | 00:00:41 | |
| Daily maintenance. | 00:00:43 | |
| Reports because. | 00:00:45 | |
| They've been dealing with snow. | 00:00:47 | |
| The last day and a half and everything else, but I will get those. | 00:00:48 | |
| Later this week and then I will post it online. I'm not going to have them. | 00:00:54 | |
| For you all to review at the next. | 00:00:57 | |
| Meeting and everything else so. | 00:00:59 | |
| Apologize for that, but we do have a. | 00:01:01 | |
| A thing for claims. | 00:01:04 | |
| This month we have 3 from Heritage and one from. | 00:01:06 | |
| Oh hmm, those are just normal activities that. | 00:01:09 | |
| Both those companies do for us. | 00:01:13 | |
| So we're just looking for approval of the claims for. | 00:01:16 | |
| None of these are above and beyond what we have contracted with them for services, correct? All right. | 00:01:19 | |
| Motion to approve. | 00:01:25 | |
| And I'll second. | 00:01:26 | |
| All in favor. | 00:01:27 | |
| Aye, aye. | 00:01:28 | |
| And heritage. | 00:01:36 | |
| Good evening Casey Deyoung with Heritage. | 00:01:42 | |
| Engineering still on. | 00:01:44 | |
| Track we've got. | 00:01:47 | |
| Only two sites this week or this month with off site segmentation. | 00:01:48 | |
| That would be bridlewood #2 on your list. | 00:01:53 | |
| And, umm. | 00:01:55 | |
| Henriette meadows #15 on your list? | 00:01:57 | |
| There are four with a probability of lost weight segmentation. | 00:02:00 | |
| So it's 17 are in compliance, 10 are. | 00:02:03 | |
| 33 total sites reviewed. | 00:02:06 | |
| Out of the two that show evidence of off site sedentation, Henriette Meadows. | 00:02:10 | |
| Was a repeat offender. It's an unprotected catch basin. It's right in front of a. | 00:02:14 | |
| Person's house, we think it's that person lifting it up, you know, because it's ponding up and kind of doing this job and so. | 00:02:20 | |
| Chris has provided some Flyers to the inspectors to hand to the owner homeowners and they've done that so hopefully. | 00:02:26 | |
| And we see that improve next time. | 00:02:32 | |
| But every time we talk to the contractor. | 00:02:34 | |
| He's always. | 00:02:36 | |
| Trying to make it right, but I think it's just kind of outside of this control with that homeowner getting involved. | 00:02:37 | |
| Do you need to visit them? | 00:02:44 | |
| Well, like I said, we've provided them Flyers showing you know what they're for and why why they're there. So hopefully we see | 00:02:47 | |
| some improvement. Otherwise we can try. If it continues to be an issue, we can. | 00:02:52 | |
| Take further steps. | 00:02:57 | |
| Is it causing ponding or anything into the neighbor's property or no it just pawns on the road? | 00:02:58 | |
| You know, and it's pretty common. I was on the job site down in Radcliffe and the contractor, I was driving through and the | 00:03:03 | |
| contractors lifting the thing up and letting the water go down because getting rid of the water in the road, it's like, you know | 00:03:08 | |
| why that's there, right? To keep that cement from going down there. And he's like, yeah. | 00:03:12 | |
| I know, you know, and so I think it's pretty common for people try and do that. Just get rid of the water on the roadway. | 00:03:17 | |
| Understand. Yeah. OK. | 00:03:20 | |
| Thank you. | 00:03:23 | |
| OK. Thank you. | 00:03:24 | |
| Chris. | 00:03:29 | |
| Yeah, I got a long term maintenance agreement that's in your packet. It's for. | 00:03:34 | |
| Cottonwood Commons, which is by. | 00:03:41 | |
| Off of a Cordon Ridge Rd. right by Gary Cabin Park. | 00:03:44 | |
| We are asking them to do a long term maintenance agreement before construction starts. So the. | 00:03:49 | |
| They can maintain. | 00:03:54 | |
| The detention pond during the construction because they're asking for smaller orifice size. | 00:03:57 | |
| So, you know, we're going to make sure that they're. | 00:04:03 | |
| Making sure that they're maintaining it and cleaning it out, making sure that it's not getting clogged and everything else. | 00:04:06 | |
| This is. | 00:04:11 | |
| The standard form that we have them signed out. | 00:04:12 | |
| Sign, but it does require a signature by the stormwater board president. | 00:04:16 | |
| On Appendix A. So that is what I'm looking for today. | 00:04:21 | |
| So they've agreed to that. | 00:04:26 | |
| And So what will happen is once. | 00:04:29 | |
| Once we have a signed copy. | 00:04:31 | |
| We'll give it back to them, they'll record it, and that's a recorded document that stays with the property. | 00:04:33 | |
| Until they decide to sell it or give it to it HOA and then they then are responsible for it. | 00:04:37 | |
| OK. | 00:04:44 | |
| Christy. | 00:04:46 | |
| Probably taking a look at it. Probably. | 00:04:48 | |
| Yeah, our office originally prepared it for you, yes. | 00:04:50 | |
| That's a Is that Jake Elders? | 00:04:54 | |
| Development, yeah. | 00:04:58 | |
| OK, so looking for a motion to let Frank sign. | 00:04:59 | |
| I'll make a motion to approve. | 00:05:05 | |
| 2nd. | 00:05:08 | |
| All in favor. | 00:05:10 | |
| Aye. | 00:05:11 | |
| OK. And I'll pick up a sign one after the meeting here. | 00:05:13 | |
| OK, umm. | 00:05:16 | |
| I got the next one on the agenda. Let me just go on. | 00:05:19 | |
| Yeah. So we just wanted to make sure we're all on the same page. We may have done this earlier in the year, but I couldn't find it | 00:05:21 | |
| in the minutes anywhere. So I'll just go ahead and bring it up to you. | 00:05:26 | |
| The Floyd County commissioners have. | 00:05:32 | |
| Set their meeting dates. | 00:05:35 | |
| For 2026. | 00:05:37 | |
| I just wanted to verify that. | 00:05:38 | |
| Stormwater wants to be. | 00:05:41 | |
| On the same time, which would be the first Tuesday of each month at 4:30 and. | 00:05:43 | |
| In your packet you would see the meeting dates. | 00:05:48 | |
| That would be for 2026, just looking for. | 00:05:51 | |
| An approval for. | 00:05:55 | |
| Having our stormwater board meetings of the first Tuesday. | 00:05:56 | |
| Every month. | 00:05:59 | |
| That or the 1st. | 00:06:00 | |
| Commissioners meeting, how about that before the 1st Commissioners? Yeah. So to your knowledge, none of these are out of sync with | 00:06:02 | |
| that, correct? | 00:06:05 | |
| No motion to approve this calendar as submitted. | 00:06:08 | |
| All in favor, aye? | 00:06:12 | |
| Thank you. | 00:06:14 | |
| Thank you. | 00:06:18 | |
| Good evening. Kristen Hughes with Stantec in your board packets is the scope of work for 2026 and it's our standard scope of work. | 00:06:24 | |
| That includes updating the billing file as well as digitizing. | 00:06:34 | |
| Some of the impervious area there was a 2020. | 00:06:39 | |
| 5 fly over so we would be using that data. | 00:06:42 | |
| To digitize some of the impervious area, we do have a new task for this year. It's. | 00:06:45 | |
| $5000 worth of effort. | 00:06:51 | |
| Last December we discussed the process for doing the billing file. | 00:06:54 | |
| And we have. | 00:06:58 | |
| Documentation with Stantec that the lady who updates the billing file every year she maintains. So what we would like to do is. | 00:07:00 | |
| Have another individual in our office try to replicate that so that. | 00:07:08 | |
| If you all are ever in the place where you do want to bring things in house. | 00:07:13 | |
| We would have that billing. | 00:07:18 | |
| The that billing process to share with you. | 00:07:19 | |
| So that's the one new task for this year, if you approve it. | 00:07:23 | |
| Questions for you or Chris or whomever. | 00:07:28 | |
| The changes that we made to the ordinance where it's a uniform flat fee. | 00:07:31 | |
| Is that? | 00:07:35 | |
| Going to facilitate bringing. | 00:07:36 | |
| Going back into house at some point in time. | 00:07:39 | |
| No, that's not. | 00:07:41 | |
| OK. | 00:07:44 | |
| We've we've always had billing and separate it's just have a third party review it and look at it. | 00:07:45 | |
| And everything else is set up in just. | 00:07:51 | |
| By having. | 00:07:57 | |
| Wow. | 00:07:58 | |
| Their software provider, Everything else. | 00:08:00 | |
| Right, so there's. | 00:08:07 | |
| But the auditor can't bring that into the Lao umbrella. They don't have capacity to do that or. | 00:08:09 | |
| I don't think so. I mean it's that the center system, we've never talked a lot about doing it. | 00:08:17 | |
| Why don't we have that conversation? I mean, even if we can save $50,000 or. | 00:08:23 | |
| Somewhere along the line, no, no offense to anybody, but you know. | 00:08:27 | |
| A third party is a third party, and if we can. | 00:08:30 | |
| Cut some cost on that. I think it's it's worth. | 00:08:33 | |
| The conversation. | 00:08:36 | |
| Is free. | 00:08:37 | |
| You know to have that. | 00:08:38 | |
| That discussion so. | 00:08:39 | |
| Should we wanna table this? | 00:08:52 | |
| I would when when do we have? What's the deadline for executing this? | 00:08:56 | |
| We're out of contract with. | 00:09:01 | |
| December 31st. | 00:09:03 | |
| Yeah, we probably won't be able to turn that around. | 00:09:11 | |
| In that short of. | 00:09:13 | |
| Period of time, but I yeah, I. | 00:09:15 | |
| I'd like to have a formal report back on that. | 00:09:17 | |
| On that conversation with with Diana. | 00:09:20 | |
| Or just maybe a joint e-mail back to us or something like that. And you know. | 00:09:23 | |
| So the total change. | 00:09:28 | |
| Between 2025 and 2026 is. | 00:09:30 | |
| What amount? It's 20,000 for the billing. | 00:09:34 | |
| 5000. | 00:09:38 | |
| If we do that extra effort of. | 00:09:39 | |
| Reviewing the billing process and just having. | 00:09:43 | |
| Someone else tried to replicate it because we know our notes, but someone else reading our notes. | 00:09:45 | |
| So that would be 5000 and then we. | 00:09:52 | |
| Every year we include an as needed. | 00:09:54 | |
| Task. So that's 10,000. So the total is 35,000. | 00:09:58 | |
| So on that 5000. | 00:10:03 | |
| Could we add that as a writer or something that we could add on the 2026 if we decide to pursue? | 00:10:09 | |
| Yeah, based on based on what she's describing, my hesitation would be if. | 00:10:16 | |
| You know, we have no intent to bring that in house. | 00:10:20 | |
| Why would we select for the extra 5000 now if we have known? That's my question, and that's fair. It's just that conversation. | 00:10:23 | |
| We had that conversation last December, so I wanted to be mindful of presenting that as an option. I'd like to take that off the | 00:10:30 | |
| table on this contract, put it on hold. | 00:10:35 | |
| And then depending on. | 00:10:39 | |
| As Christie said, unless we're gonna. | 00:10:43 | |
| Be pursuing that. | 00:10:45 | |
| There's no reason to have that. I mean, at this moment. | 00:10:47 | |
| We could do it again. | 00:10:50 | |
| Midterm or. | 00:10:52 | |
| Or late 2026, right. So we could always do an addendum to add that in if that's something we're. | 00:10:53 | |
| Or I would just. | 00:10:59 | |
| If it's easy or not to change the contract, we would not do that task unless we. | 00:11:01 | |
| Receive. | 00:11:05 | |
| Approval for. | 00:11:06 | |
| To do it from you all. | 00:11:07 | |
| Yeah, with that locks in that the 5000 but we wouldn't expend that unless we executed that part of it, Yes. So that's. | 00:11:09 | |
| Yeah, that makes the paperwork side of it easier for you all. If you give me a notice there, give Stantec a notice to proceed to | 00:11:17 | |
| move forward with that task, we will if you if Chris or the board does not then. | 00:11:22 | |
| So at anytime through 2026 we could do that for the 5000 stated otherwise we wouldn't be billed for that. | 00:11:28 | |
| Correct. | 00:11:34 | |
| I would just approve it contingent on that being removed from the documentation. | 00:11:34 | |
| OK. And then you guys can you can. | 00:11:39 | |
| Asked, you know, approve it contingent on that being removed and allow Frank to sign outside of a meeting. | 00:11:42 | |
| With that approval. | 00:11:48 | |
| That way she can remove that from the contract. Whatever works for you all Spying with me so. | 00:11:49 | |
| I don't really have any issue with any of the other elements of that so. | 00:11:54 | |
| I mean the other item is that the as needed services are not needed. We could use that to do that task as well. | 00:11:58 | |
| So the same thing with the as needed. We don't use those services unless you all have a need for us to support in another way. So. | 00:12:05 | |
| For example, this past year. | 00:12:12 | |
| The as needed services included the additional support for. | 00:12:15 | |
| The fee. | 00:12:18 | |
| OK. So should it be stricken or just put into the as needed? I would ask that the five. | 00:12:20 | |
| Come out because that's how it's built in. I get the 10 is as needed and if they don't need it, then we may be able to use five of | 00:12:26 | |
| that if you decide to sign up for this service. But let's go ahead and take out the five. | 00:12:31 | |
| Just leave it at 10 as needed. | 00:12:36 | |
| OK. And again with approval contingent on that being removed and then Frank can sign outside of a meeting? | 00:12:38 | |
| I think it's easiest path and then it can still get done before. | 00:12:44 | |
| January. | 00:12:48 | |
| OK. | 00:12:48 | |
| Provided there's no other discussion on the other elements of that, then I'm going to make a motion. We approve this contingent | 00:12:51 | |
| upon the 5000 being removed from the document. | 00:12:55 | |
| And then allowing Frank to sign. | 00:12:59 | |
| Outside of this meeting. | 00:13:02 | |
| I'll second that. | 00:13:03 | |
| OK, we have a motion all in favor. | 00:13:08 | |
| Aye. | 00:13:10 | |
| Thank you. | 00:13:12 | |
| Thanks. | 00:13:13 | |
| No public comment. | 00:13:21 | |
| 2nd. | 00:13:26 | |
| All right. | 00:13:30 | |
| You didn't even take your coat off. You can hang up for a whole. | 00:13:32 |
* use Ctrl+F (Cmd+F on Mac) to search in document
Loading...
Transcript
| It's 4:30. | 00:00:00 | |
| Let's get started with a Pledge of Allegiance. | 00:00:01 | |
| I pledge allegiance to the flag. | 00:00:05 | |
| Of the United States of America. | 00:00:07 | |
| To the Republic which stands. | 00:00:09 | |
| One nation under God, indivisible liberty, justice for all. | 00:00:11 | |
| Looking for an approval for November Minutes. | 00:00:22 | |
| Motion to approve. | 00:00:25 | |
| And I'll second. | 00:00:27 | |
| All in favor. | 00:00:28 | |
| Aye. | 00:00:30 | |
| Daily Maintenance reports Chris. | 00:00:33 | |
| Unfortunately this month. | 00:00:37 | |
| With it only being the second. | 00:00:39 | |
| We do not have a copy of the. | 00:00:41 | |
| Daily maintenance. | 00:00:43 | |
| Reports because. | 00:00:45 | |
| They've been dealing with snow. | 00:00:47 | |
| The last day and a half and everything else, but I will get those. | 00:00:48 | |
| Later this week and then I will post it online. I'm not going to have them. | 00:00:54 | |
| For you all to review at the next. | 00:00:57 | |
| Meeting and everything else so. | 00:00:59 | |
| Apologize for that, but we do have a. | 00:01:01 | |
| A thing for claims. | 00:01:04 | |
| This month we have 3 from Heritage and one from. | 00:01:06 | |
| Oh hmm, those are just normal activities that. | 00:01:09 | |
| Both those companies do for us. | 00:01:13 | |
| So we're just looking for approval of the claims for. | 00:01:16 | |
| None of these are above and beyond what we have contracted with them for services, correct? All right. | 00:01:19 | |
| Motion to approve. | 00:01:25 | |
| And I'll second. | 00:01:26 | |
| All in favor. | 00:01:27 | |
| Aye, aye. | 00:01:28 | |
| And heritage. | 00:01:36 | |
| Good evening Casey Deyoung with Heritage. | 00:01:42 | |
| Engineering still on. | 00:01:44 | |
| Track we've got. | 00:01:47 | |
| Only two sites this week or this month with off site segmentation. | 00:01:48 | |
| That would be bridlewood #2 on your list. | 00:01:53 | |
| And, umm. | 00:01:55 | |
| Henriette meadows #15 on your list? | 00:01:57 | |
| There are four with a probability of lost weight segmentation. | 00:02:00 | |
| So it's 17 are in compliance, 10 are. | 00:02:03 | |
| 33 total sites reviewed. | 00:02:06 | |
| Out of the two that show evidence of off site sedentation, Henriette Meadows. | 00:02:10 | |
| Was a repeat offender. It's an unprotected catch basin. It's right in front of a. | 00:02:14 | |
| Person's house, we think it's that person lifting it up, you know, because it's ponding up and kind of doing this job and so. | 00:02:20 | |
| Chris has provided some Flyers to the inspectors to hand to the owner homeowners and they've done that so hopefully. | 00:02:26 | |
| And we see that improve next time. | 00:02:32 | |
| But every time we talk to the contractor. | 00:02:34 | |
| He's always. | 00:02:36 | |
| Trying to make it right, but I think it's just kind of outside of this control with that homeowner getting involved. | 00:02:37 | |
| Do you need to visit them? | 00:02:44 | |
| Well, like I said, we've provided them Flyers showing you know what they're for and why why they're there. So hopefully we see | 00:02:47 | |
| some improvement. Otherwise we can try. If it continues to be an issue, we can. | 00:02:52 | |
| Take further steps. | 00:02:57 | |
| Is it causing ponding or anything into the neighbor's property or no it just pawns on the road? | 00:02:58 | |
| You know, and it's pretty common. I was on the job site down in Radcliffe and the contractor, I was driving through and the | 00:03:03 | |
| contractors lifting the thing up and letting the water go down because getting rid of the water in the road, it's like, you know | 00:03:08 | |
| why that's there, right? To keep that cement from going down there. And he's like, yeah. | 00:03:12 | |
| I know, you know, and so I think it's pretty common for people try and do that. Just get rid of the water on the roadway. | 00:03:17 | |
| Understand. Yeah. OK. | 00:03:20 | |
| Thank you. | 00:03:23 | |
| OK. Thank you. | 00:03:24 | |
| Chris. | 00:03:29 | |
| Yeah, I got a long term maintenance agreement that's in your packet. It's for. | 00:03:34 | |
| Cottonwood Commons, which is by. | 00:03:41 | |
| Off of a Cordon Ridge Rd. right by Gary Cabin Park. | 00:03:44 | |
| We are asking them to do a long term maintenance agreement before construction starts. So the. | 00:03:49 | |
| They can maintain. | 00:03:54 | |
| The detention pond during the construction because they're asking for smaller orifice size. | 00:03:57 | |
| So, you know, we're going to make sure that they're. | 00:04:03 | |
| Making sure that they're maintaining it and cleaning it out, making sure that it's not getting clogged and everything else. | 00:04:06 | |
| This is. | 00:04:11 | |
| The standard form that we have them signed out. | 00:04:12 | |
| Sign, but it does require a signature by the stormwater board president. | 00:04:16 | |
| On Appendix A. So that is what I'm looking for today. | 00:04:21 | |
| So they've agreed to that. | 00:04:26 | |
| And So what will happen is once. | 00:04:29 | |
| Once we have a signed copy. | 00:04:31 | |
| We'll give it back to them, they'll record it, and that's a recorded document that stays with the property. | 00:04:33 | |
| Until they decide to sell it or give it to it HOA and then they then are responsible for it. | 00:04:37 | |
| OK. | 00:04:44 | |
| Christy. | 00:04:46 | |
| Probably taking a look at it. Probably. | 00:04:48 | |
| Yeah, our office originally prepared it for you, yes. | 00:04:50 | |
| That's a Is that Jake Elders? | 00:04:54 | |
| Development, yeah. | 00:04:58 | |
| OK, so looking for a motion to let Frank sign. | 00:04:59 | |
| I'll make a motion to approve. | 00:05:05 | |
| 2nd. | 00:05:08 | |
| All in favor. | 00:05:10 | |
| Aye. | 00:05:11 | |
| OK. And I'll pick up a sign one after the meeting here. | 00:05:13 | |
| OK, umm. | 00:05:16 | |
| I got the next one on the agenda. Let me just go on. | 00:05:19 | |
| Yeah. So we just wanted to make sure we're all on the same page. We may have done this earlier in the year, but I couldn't find it | 00:05:21 | |
| in the minutes anywhere. So I'll just go ahead and bring it up to you. | 00:05:26 | |
| The Floyd County commissioners have. | 00:05:32 | |
| Set their meeting dates. | 00:05:35 | |
| For 2026. | 00:05:37 | |
| I just wanted to verify that. | 00:05:38 | |
| Stormwater wants to be. | 00:05:41 | |
| On the same time, which would be the first Tuesday of each month at 4:30 and. | 00:05:43 | |
| In your packet you would see the meeting dates. | 00:05:48 | |
| That would be for 2026, just looking for. | 00:05:51 | |
| An approval for. | 00:05:55 | |
| Having our stormwater board meetings of the first Tuesday. | 00:05:56 | |
| Every month. | 00:05:59 | |
| That or the 1st. | 00:06:00 | |
| Commissioners meeting, how about that before the 1st Commissioners? Yeah. So to your knowledge, none of these are out of sync with | 00:06:02 | |
| that, correct? | 00:06:05 | |
| No motion to approve this calendar as submitted. | 00:06:08 | |
| All in favor, aye? | 00:06:12 | |
| Thank you. | 00:06:14 | |
| Thank you. | 00:06:18 | |
| Good evening. Kristen Hughes with Stantec in your board packets is the scope of work for 2026 and it's our standard scope of work. | 00:06:24 | |
| That includes updating the billing file as well as digitizing. | 00:06:34 | |
| Some of the impervious area there was a 2020. | 00:06:39 | |
| 5 fly over so we would be using that data. | 00:06:42 | |
| To digitize some of the impervious area, we do have a new task for this year. It's. | 00:06:45 | |
| $5000 worth of effort. | 00:06:51 | |
| Last December we discussed the process for doing the billing file. | 00:06:54 | |
| And we have. | 00:06:58 | |
| Documentation with Stantec that the lady who updates the billing file every year she maintains. So what we would like to do is. | 00:07:00 | |
| Have another individual in our office try to replicate that so that. | 00:07:08 | |
| If you all are ever in the place where you do want to bring things in house. | 00:07:13 | |
| We would have that billing. | 00:07:18 | |
| The that billing process to share with you. | 00:07:19 | |
| So that's the one new task for this year, if you approve it. | 00:07:23 | |
| Questions for you or Chris or whomever. | 00:07:28 | |
| The changes that we made to the ordinance where it's a uniform flat fee. | 00:07:31 | |
| Is that? | 00:07:35 | |
| Going to facilitate bringing. | 00:07:36 | |
| Going back into house at some point in time. | 00:07:39 | |
| No, that's not. | 00:07:41 | |
| OK. | 00:07:44 | |
| We've we've always had billing and separate it's just have a third party review it and look at it. | 00:07:45 | |
| And everything else is set up in just. | 00:07:51 | |
| By having. | 00:07:57 | |
| Wow. | 00:07:58 | |
| Their software provider, Everything else. | 00:08:00 | |
| Right, so there's. | 00:08:07 | |
| But the auditor can't bring that into the Lao umbrella. They don't have capacity to do that or. | 00:08:09 | |
| I don't think so. I mean it's that the center system, we've never talked a lot about doing it. | 00:08:17 | |
| Why don't we have that conversation? I mean, even if we can save $50,000 or. | 00:08:23 | |
| Somewhere along the line, no, no offense to anybody, but you know. | 00:08:27 | |
| A third party is a third party, and if we can. | 00:08:30 | |
| Cut some cost on that. I think it's it's worth. | 00:08:33 | |
| The conversation. | 00:08:36 | |
| Is free. | 00:08:37 | |
| You know to have that. | 00:08:38 | |
| That discussion so. | 00:08:39 | |
| Should we wanna table this? | 00:08:52 | |
| I would when when do we have? What's the deadline for executing this? | 00:08:56 | |
| We're out of contract with. | 00:09:01 | |
| December 31st. | 00:09:03 | |
| Yeah, we probably won't be able to turn that around. | 00:09:11 | |
| In that short of. | 00:09:13 | |
| Period of time, but I yeah, I. | 00:09:15 | |
| I'd like to have a formal report back on that. | 00:09:17 | |
| On that conversation with with Diana. | 00:09:20 | |
| Or just maybe a joint e-mail back to us or something like that. And you know. | 00:09:23 | |
| So the total change. | 00:09:28 | |
| Between 2025 and 2026 is. | 00:09:30 | |
| What amount? It's 20,000 for the billing. | 00:09:34 | |
| 5000. | 00:09:38 | |
| If we do that extra effort of. | 00:09:39 | |
| Reviewing the billing process and just having. | 00:09:43 | |
| Someone else tried to replicate it because we know our notes, but someone else reading our notes. | 00:09:45 | |
| So that would be 5000 and then we. | 00:09:52 | |
| Every year we include an as needed. | 00:09:54 | |
| Task. So that's 10,000. So the total is 35,000. | 00:09:58 | |
| So on that 5000. | 00:10:03 | |
| Could we add that as a writer or something that we could add on the 2026 if we decide to pursue? | 00:10:09 | |
| Yeah, based on based on what she's describing, my hesitation would be if. | 00:10:16 | |
| You know, we have no intent to bring that in house. | 00:10:20 | |
| Why would we select for the extra 5000 now if we have known? That's my question, and that's fair. It's just that conversation. | 00:10:23 | |
| We had that conversation last December, so I wanted to be mindful of presenting that as an option. I'd like to take that off the | 00:10:30 | |
| table on this contract, put it on hold. | 00:10:35 | |
| And then depending on. | 00:10:39 | |
| As Christie said, unless we're gonna. | 00:10:43 | |
| Be pursuing that. | 00:10:45 | |
| There's no reason to have that. I mean, at this moment. | 00:10:47 | |
| We could do it again. | 00:10:50 | |
| Midterm or. | 00:10:52 | |
| Or late 2026, right. So we could always do an addendum to add that in if that's something we're. | 00:10:53 | |
| Or I would just. | 00:10:59 | |
| If it's easy or not to change the contract, we would not do that task unless we. | 00:11:01 | |
| Receive. | 00:11:05 | |
| Approval for. | 00:11:06 | |
| To do it from you all. | 00:11:07 | |
| Yeah, with that locks in that the 5000 but we wouldn't expend that unless we executed that part of it, Yes. So that's. | 00:11:09 | |
| Yeah, that makes the paperwork side of it easier for you all. If you give me a notice there, give Stantec a notice to proceed to | 00:11:17 | |
| move forward with that task, we will if you if Chris or the board does not then. | 00:11:22 | |
| So at anytime through 2026 we could do that for the 5000 stated otherwise we wouldn't be billed for that. | 00:11:28 | |
| Correct. | 00:11:34 | |
| I would just approve it contingent on that being removed from the documentation. | 00:11:34 | |
| OK. And then you guys can you can. | 00:11:39 | |
| Asked, you know, approve it contingent on that being removed and allow Frank to sign outside of a meeting. | 00:11:42 | |
| With that approval. | 00:11:48 | |
| That way she can remove that from the contract. Whatever works for you all Spying with me so. | 00:11:49 | |
| I don't really have any issue with any of the other elements of that so. | 00:11:54 | |
| I mean the other item is that the as needed services are not needed. We could use that to do that task as well. | 00:11:58 | |
| So the same thing with the as needed. We don't use those services unless you all have a need for us to support in another way. So. | 00:12:05 | |
| For example, this past year. | 00:12:12 | |
| The as needed services included the additional support for. | 00:12:15 | |
| The fee. | 00:12:18 | |
| OK. So should it be stricken or just put into the as needed? I would ask that the five. | 00:12:20 | |
| Come out because that's how it's built in. I get the 10 is as needed and if they don't need it, then we may be able to use five of | 00:12:26 | |
| that if you decide to sign up for this service. But let's go ahead and take out the five. | 00:12:31 | |
| Just leave it at 10 as needed. | 00:12:36 | |
| OK. And again with approval contingent on that being removed and then Frank can sign outside of a meeting? | 00:12:38 | |
| I think it's easiest path and then it can still get done before. | 00:12:44 | |
| January. | 00:12:48 | |
| OK. | 00:12:48 | |
| Provided there's no other discussion on the other elements of that, then I'm going to make a motion. We approve this contingent | 00:12:51 | |
| upon the 5000 being removed from the document. | 00:12:55 | |
| And then allowing Frank to sign. | 00:12:59 | |
| Outside of this meeting. | 00:13:02 | |
| I'll second that. | 00:13:03 | |
| OK, we have a motion all in favor. | 00:13:08 | |
| Aye. | 00:13:10 | |
| Thank you. | 00:13:12 | |
| Thanks. | 00:13:13 | |
| No public comment. | 00:13:21 | |
| 2nd. | 00:13:26 | |
| All right. | 00:13:30 | |
| You didn't even take your coat off. You can hang up for a whole. | 00:13:32 |